The Outwell Fernley Reclining Chair is an essential addition to your camping and caravanning holiday.
The best feature of the Fernley Chair is its adjustable reclining back, allowing you to find the perfect sitting position for your ultimate comfort. Whether you prefer an upright seat or a more laid-back position, the Fernley Chair caters to your needs.
Constructed with a lightweight aluminium frame, this chair is not only durable but also incredibly portable. The padded seat and backrest provide insulation and comfort, ensuring you can enjoy hours of relaxation without any discomfort.
When it's time to pack up and head home, the Fernley Chair folds up flat, making storage and transport easy. No need to struggle with complicated assembly, as this chair opens and folds in seconds.
Fabric - Two-tone, soft foam, 100% polyester
Frame - Powder coated aluminium
Weight - 4.8 kg
Size - 64 x 76 x 108 cm (WxDxH)
Pack size - 64 x 11 x 88 cm
Seat Height - 46 cm
Max load - 150 kg
Thick padding on seat and backrest enhances insulation and comfort
Integrated and detachable foam pillow at neck area
7 positions
Ergonomic armrest design with easy grip
No assembly required
Lightweight and easy to carry
Opens and folds in seconds
FREE DELIVERY ON ORDERS OVER £100
ORDERS UNDER £100 - STANDARD DELIVERY COST £7.99
Delivery - 4-7 working Days UK Mainland Only
We ONLY deliver to UK Mainland addresses (excluding Scottish Highlands).
Orders will require a signature to acknowledge delivery. The signature of the person accepting delivery at the delivery address will be proof that delivery has been received by you or the person, to whom the order is addressed. If no one is available to accept the delivery you will receive a card to advise that a delivery has been attempted.
It is your responsibility to ensure the delivery address is ready and able to accept the delivery of the product.
We shall have no liability to you in respect of any delay or failure to deliver a product due to circumstances beyond our reasonable control, including (without limitation) delay or failure caused by adverse weather, strikes or transport problems.