Outwell Catamarca Chair Black

Price
Regular price £24.99
Regular price £32.99 Black November £24.99
Save £8
/
Free mainland UK shipping on orders over £100
  • Perfect for Camping, Picnics and Festivals
  • Size - 84 x 50 x 85 cm (WxDxH)
  • Max Load: 125 kg

You may also like

The Outwell Catamarca Chair in black is the epitome of quality and comfort for your camping adventures. With its premium design and lightweight construction, it ensures a touch of class and convenience during your outdoor activities.

Frame: The chair boasts a sturdy powder-coated steel frame, providing reliable support and durability. The elegant, logo-embossed fabric adds a touch of style to your outdoor seating.

Fabric: Made from 100% polyester, the chair's fabric offers both comfort and practicality, making it a perfect choice for outdoor use.

Max Loading Weight: With a maximum load capacity of 125kg ensuring versatility for different outdoor occasions.

Fabric - 100% polyester

Frame - Powder coated steel

Weight - 3 kg

Size - 84 x 50 x 85 cm (WxDxH)

Pack size - 15 x 14 x 86 cm

Seat Height - 43 cm

Max load - 125 kg

Opens and folds in seconds

No assembly required

Lightweight and easy to carry

Cup holder

Includes carrybag for easy storage and portability

FREE DELIVERY ON ORDERS OVER £100

ORDERS UNDER £100 - STANDARD DELIVERY COST £7.99

Delivery - 4-7 working Days UK Mainland Only

We ONLY deliver to UK Mainland addresses (excluding Scottish Highlands).

Orders will require a signature to acknowledge delivery. The signature of the person accepting delivery at the delivery address will be proof that delivery has been received by you or the person, to whom the order is addressed. If no one is available to accept the delivery you will receive a card to advise that a delivery has been attempted.

It is your responsibility to ensure the delivery address is ready and able to accept the delivery of the product.

We shall have no liability to you in respect of any delay or failure to deliver a product due to circumstances beyond our reasonable control, including (without limitation) delay or failure caused by adverse weather, strikes or transport problems.